Southern California Edison's 2009 Demand Response Load Impact Evaluations Portfolio Summary

This report summarizes the load reduction capability from Southern California Edison’s (SCE) portfolio of Demand Response (DR) programs.

It details the load impacts from 2009 events (ex post impacts) and load reduction capabilities for 2010 through 2020 under 1-in-2 and 1-in-10 system conditions (ex-ante impacts). The report adheres to the April 8, 2010 decision by the California Public Utilities Commission (CPUC) that requires a DR portfolio summary and specifies the format and content of the summary.1 The following 16 DR resources listed in Table 1-1 are summarized in this report.

Read the full report